top of page

Stage 2 - Detailed Review 

Once the client, designer or contractor has specified all the water usage fixtures and fittings using the Water Calculation form (a copy of which will be sent to you after checkout).

 

We will conduct a detailed review to the proposed to ensure compliance with the site requirements detailed above. This review must be undertaken by us prior to any orders being placed and any fixtures or fittings being installed. Failure to do so may result in non-compliance, costly abortive works on site and additional charges. Additionally, this report can be submitted to Building Control to demonstrate conditional compliance with Part G of the building regulations.

 

Price is per plot and includes one calculation report. For multiple plots adjust quantity in cart before checkout.

 

Standard turnaround times are 3-5 working days from receipt of completed water fixtures and fittings form. The form will be issued after checkout. For a faster turnaround time use our Express Service.

Detailed Water Efficiency Calculation (Stage 2: Post-Planning Stage)

£195.00Price
Excluding VAT
  • Upon checkout you'll be sent a link to download our simple to use water fixtures and fittings schedule. Please fully complete and return the form to us using the form/link provided and we'll be able to calculate your water efficiency calculation. Please note your calculation will not commence until we receive the fully completed form. Form submitted incomplete will result in delays.

bottom of page